Feb 102017
 

About this time last year, Leanne and I were stressed out and I was trying to

Keep Calm

&

Blog Positively

After three weeks of trying to get our contractor to give us a reasonable answer as to why our invoice was higher than their quote with the project nowhere near finished, they had up and left.

I wrote a rambling post which saying that we were going through a rough patch, but stopped short of pointing fingers.

Buried at the end of the post was this video with little context. Let me give you a little context now.

For three weeks in rainy January our contractor pressured us to pay their invoice while their crew continued to work. They had us over a barrel. The house had no roof so if they stopped working, what would we do? Over three meetings with their management (but not the owner) we paid them a further $35,000 in the hopes that we could work something out.

This photo might be upside down on mobile devices–sorry!

On January 26th, they packed up and left.

On that day, we took the first part of the video in which you can see how badly the make-shift plastic cover was working. Leaks were coming through the plywood “roof” and making their way into the heritage interior.

Our contractor warned us that hiring another roofer was a breach of our contract, which, it turns out, was BS. Was it a scam pure and simple? Did the contractor deliberately send the invoice through the roof right when we didn’t have one?

Whatever the case, we’re stubborn and don’t like feeling bullied so we set about finding a good roofer (which you can read about here).

That’s when the wind storm happened.

This slideshow requires JavaScript.

Living next door in the Little Yellow House, we were sometimes woken by the sound of the great plastic sheets blowing in the wind. Our nightmare was that the cover would be blown clean off one night.

And it almost did. Two nights after being left in the lurch, on January 28th, while the kids slept blissfully on, Leanne and I woke up to wind, rain and plastic blowing free.

We ran over to Hammond Forever House and wrestled to get protection back on the house for over an hour. I was clambering all over the slick plywood surface in the dark while wind blew plastic in my face. Leanne worked below to fasten the ends that I handed down to her. We would secure one corner and move to another and then discover that the first one had come undone again.

Listen to my voice in the video. Listen to how difficult it is for me not to curse our contractor’s name. How reserved I was. How deep was my anger. We must take comfort that it was only wind and rain and not the 25 cm of snow and freezing rain that we are getting now, one year later!

Is this normal for the home renovation industry? You can share your experience in the comments if you like. I would love to know.